What a plan can clarify
An architecture plan describes the problem, intended structure, decisions, constraints, and evidence needed to guide work. Depending on the decision, it may identify existing components, a proposed target, data flows, permissions, dependencies, tradeoffs, and unresolved questions.
The C4 model offers several levels of software architecture diagrams. It is one way to communicate structure, not a requirement to use a particular notation. A diagram is most useful when it answers a specific question and remains connected to the decisions behind it.
What implementation adds
Implementation may involve configuration, code, content, migration, integration, testing, and operational preparation within an agreed scope. It needs appropriate access, approved changes, verification criteria, and someone responsible for review.
For a fictional website-to-CRM project, a plan might describe the information, owners, and failure handling. A separately authorized build could implement and test that connection. The example is not a client claim or a promise that a standard engagement includes a particular integration.
Make the boundary explicit
Before work begins, agree on actual deliverables, assumptions, exclusions, responsibilities, access, costs, and approval points in the relevant agreement. A plan alone does not connect accounts, migrate data, or authorize a release.
When new evidence changes a material decision, record the effect on scope, users, data, permissions, risk, tests, and operations. Revisit the relevant approvals and retain the decision history. A deployment is a separate event from a demonstrated business outcome.
A decision record can make a consequential choice understandable later: describe the problem, options considered, chosen direction, tradeoffs, and status. Microsoft recommends preserving the history when a decision changes; the level of formality should fit the project, rather than turning every minor choice into a separate document.
Plan verification and handoff
Identify who will maintain the result, how it will be monitored, and what evidence will show that agreed work was completed. Implementation should produce actual observations tied to the version and environment, not merely repeat the plan's acceptance criteria.
For the fictional website-to-CRM example, the plan could specify which system owns each field, who may authorize access, what happens when a request fails, and how a duplicate is handled. The implementation record can then identify the configured connection, test data, observed success and failure paths, and any steps still awaiting a real provider test.
A technical specification may also describe interfaces, a test plan, monitoring, and rollout or rollback considerations. Microsoft's workload guidance presents these as items to consider for implementation; the appropriate detail depends on the system and its risks.
A local test does not prove the behavior of a released service for real users. Where a step cannot be verified, label it unknown and identify the next action. The distinction helps the team decide what to build, who may authorize it, and how to check the result.
Sources
- The C4 model for visualising software architecture — An example model for communicating software structure, not a contract or required notation.
- Microsoft: Maintain an architecture decision record — Guidance on recording context, tradeoffs, status, and decision history.
- Microsoft: Develop an architecture design specification — An example of the information a technical specification can provide for implementation.
Explore the preliminary checker · Browse research · Discuss your next step